CMU mechanical screen wall

$17.90 / SF

MS-D3-009 · MasterFormat 04 22 00 · SF

What’s in this rate

This unit covers CMU mechanical screen wall, measured per square foot. The bricklayer lays CMU mechanical-yard screen wall with tooled joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. CMU screen block, field CMU wall, CMU parapet wall are separate units.

Includes

  • CMU units / block as specified
  • Type S mortar allocation
  • bed and head joints with tooling
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • cmu-screen-block decorative
  • field CMU wall
  • louvers
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.16 hr × $52.00 wage and burden
$8.32
Material and small tools
$6.47
Direct rate (labor, material, and tools)
$14.79 / SF
Overhead 10% of direct
$1.48
Fee 10% of (direct and overhead)
$1.63
Loaded rate
$17.90 / SF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.