CMU mechanical screen wall
$17.90 / SF
MS-D3-009 · MasterFormat 04 22 00 · SF
What’s in this rate
This unit covers CMU mechanical screen wall, measured per square foot. The bricklayer lays CMU mechanical-yard screen wall with tooled joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. CMU screen block, field CMU wall, CMU parapet wall are separate units.
Includes
- CMU units / block as specified
- Type S mortar allocation
- bed and head joints with tooling
- layout and installation described above
- stated material waste and small tools
Excludes
- cmu-screen-block decorative
- field CMU wall
- louvers
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.16 hr × $52.00 wage and burden
- $8.32
- Material and small tools
- $6.47
- Direct rate (labor, material, and tools)
- $14.79 / SF
- Overhead 10% of direct
- $1.48
- Fee 10% of (direct and overhead)
- $1.63
- Loaded rate
- $17.90 / SF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
