Vertical rebar in CMU

$6.27 / LF

MS-015 · MasterFormat 04 22 00 · LF

What’s in this rate

This unit covers Vertical rebar in CMU, measured per linear foot. The bricklayer places vertical reinforcing bars in CMU cells and holds position for grouting. The rate covers the listed material, 3.00% material waste, labor, and small tools. grout-filled CMU cell, masonry grout place, slab rebar-install, CMU wall lay are separate units.

Includes

  • vertical rebar cut/place in CMU cells
  • positioners / spacers allocation as scoped
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • slab rebar-install-*
  • grout fill
  • CMU wall lay
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.06 hr × $52.00 wage and burden
$3.12
Material and small tools
$2.06
Direct rate (labor, material, and tools)
$5.18 / LF
Overhead 10% of direct
$0.52
Fee 10% of (direct and overhead)
$0.57
Loaded rate
$6.27 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.