Ladder joint reinforcement CMU

$4.88 / LF

MS-014 · MasterFormat 04 22 00 · LF

What’s in this rate

This unit covers Ladder joint reinforcement CMU, measured per linear foot. The bricklayer places ladder-type joint reinforcement in the CMU bed joint as courses advance. The rate covers the listed material, 3.00% material waste, labor, and small tools. truss joint reinforcement CMU, vertical rebar in CMU, masonry wall tie are separate units.

Includes

  • ladder-type joint reinforcement
  • placement in CMU bed joint
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • truss-type joint reinforcement
  • vertical rebar
  • wall ties
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.05 hr × $52.00 wage and burden
$2.60
Material and small tools
$1.44
Direct rate (labor, material, and tools)
$4.04 / LF
Overhead 10% of direct
$0.40
Fee 10% of (direct and overhead)
$0.44
Loaded rate
$4.88 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.