12 in CMU wall

$14.73 / SF

MS-003 · MasterFormat 04 22 00 · SF

What’s in this rate

This unit covers 12 in CMU wall, measured per square foot. The bricklayer lays standard 12-inch CMU in running bond with tooled mortar joints for thicker commercial walls. The rate covers the listed material, 5.00% material waste, labor, and small tools. grout-filled CMU cell, vertical rebar in CMU, 8 in / 6 in CMU walls, bond beam block are separate units.

Includes

  • 12 in cmu wall units / block
  • Type S mortar allocation
  • bed and head joints with tooling
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • grout fill of cells
  • vertical / horizontal rebar
  • ladder / truss joint reinforcement
  • bond beam course
  • control joints, weeps, flashing
  • paint / coating (paint-cmu-*)
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.14 hr × $52.00 wage and burden
$7.28
Material and small tools
$4.89
Direct rate (labor, material, and tools)
$12.17 / SF
Overhead 10% of direct
$1.22
Fee 10% of (direct and overhead)
$1.34
Loaded rate
$14.73 / SF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.