12 in CMU wall
$14.73 / SF
MS-003 · MasterFormat 04 22 00 · SF
What’s in this rate
This unit covers 12 in CMU wall, measured per square foot. The bricklayer lays standard 12-inch CMU in running bond with tooled mortar joints for thicker commercial walls. The rate covers the listed material, 5.00% material waste, labor, and small tools. grout-filled CMU cell, vertical rebar in CMU, 8 in / 6 in CMU walls, bond beam block are separate units.
Includes
- 12 in cmu wall units / block
- Type S mortar allocation
- bed and head joints with tooling
- layout and installation described above
- stated material waste and small tools
Excludes
- grout fill of cells
- vertical / horizontal rebar
- ladder / truss joint reinforcement
- bond beam course
- control joints, weeps, flashing
- paint / coating (paint-cmu-*)
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.14 hr × $52.00 wage and burden
- $7.28
- Material and small tools
- $4.89
- Direct rate (labor, material, and tools)
- $12.17 / SF
- Overhead 10% of direct
- $1.22
- Fee 10% of (direct and overhead)
- $1.34
- Loaded rate
- $14.73 / SF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
