4 in CMU partition

$7.82 / SF

MS-004 · MasterFormat 04 22 00 · SF

What’s in this rate

This unit covers 4 in CMU partition, measured per square foot. The bricklayer lays 4-inch CMU as a non-load partition with tooled mortar joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. 6 in / 8 in / 12 in CMU walls, grout-filled cell, paint-cmu finishes are separate units.

Includes

  • 4 in cmu partition units / block
  • Type S mortar allocation
  • bed and head joints with tooling
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • grout fill of cells
  • vertical / horizontal rebar
  • ladder / truss joint reinforcement
  • bond beam course
  • control joints, weeps, flashing
  • paint / coating (paint-cmu-*)
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.08 hr × $52.00 wage and burden
$4.16
Material and small tools
$2.30
Direct rate (labor, material, and tools)
$6.46 / SF
Overhead 10% of direct
$0.65
Fee 10% of (direct and overhead)
$0.71
Loaded rate
$7.82 / SF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.