4 in CMU partition
$7.82 / SF
MS-004 · MasterFormat 04 22 00 · SF
What’s in this rate
This unit covers 4 in CMU partition, measured per square foot. The bricklayer lays 4-inch CMU as a non-load partition with tooled mortar joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. 6 in / 8 in / 12 in CMU walls, grout-filled cell, paint-cmu finishes are separate units.
Includes
- 4 in cmu partition units / block
- Type S mortar allocation
- bed and head joints with tooling
- layout and installation described above
- stated material waste and small tools
Excludes
- grout fill of cells
- vertical / horizontal rebar
- ladder / truss joint reinforcement
- bond beam course
- control joints, weeps, flashing
- paint / coating (paint-cmu-*)
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.08 hr × $52.00 wage and burden
- $4.16
- Material and small tools
- $2.30
- Direct rate (labor, material, and tools)
- $6.46 / SF
- Overhead 10% of direct
- $0.65
- Fee 10% of (direct and overhead)
- $0.71
- Loaded rate
- $7.82 / SF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
