14" CMU wall

$17.65 / SF

MS-D3-001 · MasterFormat 04 22 00 · SF

What’s in this rate

This unit covers 14" CMU wall, measured per square foot. The bricklayer lays 14-inch CMU in running bond with tooled mortar joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. 4-inch CMU wall, 6-inch CMU wall, 8-inch CMU wall, 10-inch CMU wall, 12-inch CMU wall, 16-inch CMU wall, paint-cmu finishes are separate units.

Includes

  • CMU units / block as specified
  • Type S mortar allocation
  • bed and head joints with tooling
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • 4/6/8/10/12/16-inch CMU walls
  • grout / rebar
  • paint-cmu-*
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.15 hr × $52.00 wage and burden
$7.80
Material and small tools
$6.79
Direct rate (labor, material, and tools)
$14.59 / SF
Overhead 10% of direct
$1.46
Fee 10% of (direct and overhead)
$1.60
Loaded rate
$17.65 / SF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.