Carton form place
$5.61 / SF
CN-106 · MasterFormat 03 11 00 · SF
What’s in this rate
This unit is cutting and placing one square foot of carton void form below a prepared commercial grade beam or structural pour. The cement mason sets and secures the form ready for reinforcement and concrete. Excavation, concrete, reinforcement, and backfill are separate units.
Includes
- carton void-form material with 5% waste
- cut, set, and secure form
- small tools
Excludes
- excavation
- subgrade
- grade-beam concrete
- reinforcing steel
- backfill
- shoring
Build-up
- Labor 0.065 hr × $48.00 wage and burden
- $3.12
- Material and small tools
- $1.52
- Direct rate (labor, material, and tools)
- $4.64 / SF
- Overhead 10% of direct
- $0.46
- Fee 10% of (direct and overhead)
- $0.51
- Loaded rate
- $5.61 / SF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
