Concrete unit rates
Published concrete flatwork unit rates: slabs, sidewalks, curb and gutter, patch, rebar, sealer, and pads. Each page is one unit with a loaded price.
Also see electrical unit rates, low-voltage unit rates, roofing unit rates, drywall unit rates, painting unit rates, flooring unit rates, plumbing unit rates, HVAC unit rates, fire protection unit rates, masonry unit rates, structural steel unit rates, and earthwork unit rates.
- 6" wall pour$13.57 / SFIncludes 10% overhead and 10% fee
- 8" wall pour$18.11 / SFIncludes 10% overhead and 10% fee
- 10" wall pour$19.17 / SFIncludes 10% overhead and 10% fee
- 12" wall pour$20.51 / SFIncludes 10% overhead and 10% fee
- Anchor bolt set$15.49 / EAIncludes 10% overhead and 10% fee
- Apply concrete sealer$0.86 / SFIncludes 10% overhead and 10% fee
- Architectural formliner$7.89 / SFIncludes 10% overhead and 10% fee
- Beam void form$7.26 / LFIncludes 10% overhead and 10% fee
- Bentonite strip waterstop$6.42 / LFIncludes 10% overhead and 10% fee
- Bentonite waterstop$7.14 / LFIncludes 10% overhead and 10% fee
- Boiler housekeeping pad$17.52 / SFIncludes 10% overhead and 10% fee
- Bond beam place$9.03 / LFIncludes 10% overhead and 10% fee
- Bond breaker application$1.07 / SFIncludes 10% overhead and 10% fee
- Broom finish (finish-only)$1.42 / SFIncludes 10% overhead and 10% fee
- Broom finish apron$1.71 / SFIncludes 10% overhead and 10% fee
- Broom-finish plaza$5.80 / SFIncludes 10% overhead and 10% fee
- Broom-finish ramp$5.91 / SFIncludes 10% overhead and 10% fee
- Broom-finish sidewalk$5.48 / SFIncludes 10% overhead and 10% fee
- Bush-hammer finish$7.78 / SFIncludes 10% overhead and 10% fee
- Caisson bell pour$28.64 / CFIncludes 10% overhead and 10% fee
- Caisson cap place$30.59 / CFIncludes 10% overhead and 10% fee
- Caisson pour$27.94 / CFIncludes 10% overhead and 10% fee
- Carton form place$5.61 / SFIncludes 10% overhead and 10% fee
- Carton form place$8.88 / SFIncludes 10% overhead and 10% fee
- Cast stair nosing$7.48 / LFIncludes 10% overhead and 10% fee
- Cast stair riser$10.13 / LFIncludes 10% overhead and 10% fee
- Cast stair stringer$23.76 / LFIncludes 10% overhead and 10% fee
- Cast-in-place curb & gutter$27.35 / LFIncludes 10% overhead and 10% fee
- Centerbulb PVC waterstop$9.04 / LFIncludes 10% overhead and 10% fee
- Channel drain grate frame$16.98 / LFIncludes 10% overhead and 10% fee
- Channel drain place$19.47 / LFIncludes 10% overhead and 10% fee
- Chemical grout injection$15.13 / LFIncludes 10% overhead and 10% fee
- Chiller housekeeping pad$17.96 / SFIncludes 10% overhead and 10% fee
- Column capital pour$24.77 / CFIncludes 10% overhead and 10% fee
- Column footing place$26.71 / CFIncludes 10% overhead and 10% fee
- Column form set$16.40 / LFIncludes 10% overhead and 10% fee
- Column pier pour$29.23 / CFIncludes 10% overhead and 10% fee
- Column pour$27.31 / CFIncludes 10% overhead and 10% fee
- Concrete patch repair$19.79 / SFIncludes 10% overhead and 10% fee
- Concrete sawcut$4.88 / LFIncludes 10% overhead and 10% fee
- Concrete spall repair$25.26 / SFIncludes 10% overhead and 10% fee
- Construction joint key$8.66 / LFIncludes 10% overhead and 10% fee
- Construction joint keyway$8.55 / LFIncludes 10% overhead and 10% fee
- Contraction joint seal$7.53 / LFIncludes 10% overhead and 10% fee
- Control joint saw cut$2.56 / LFIncludes 10% overhead and 10% fee
- Control joint seal$7.56 / LFIncludes 10% overhead and 10% fee
- Core wall form$17.34 / SFIncludes 10% overhead and 10% fee
- Cream polish finish$7.50 / SFIncludes 10% overhead and 10% fee
- Curb and gutter$30.15 / LFIncludes 10% overhead and 10% fee
- Curb only cast-in-place$18.75 / LFIncludes 10% overhead and 10% fee