Column capital pour
$24.77 / CF
CN-115 · MasterFormat 03 30 00 · CF
What’s in this rate
This unit is placing one cubic foot of cast-in-place concrete column capital at prepared forms. The cement mason places, consolidates, and finishes the capital profile ready for cure. Columns, rebar, embeds, and full formwork are separate units.
Includes
- column-capital concrete with 5% waste
- place, consolidate, and finish capital
- small tools
Excludes
- column shaft
- rebar
- embeds
- full form system
- shoring
- engineering
Build-up
- Labor 0.24 hr × $48.00 wage and burden
- $11.52
- Material and small tools
- $8.95
- Direct rate (labor, material, and tools)
- $20.47 / CF
- Overhead 10% of direct
- $2.05
- Fee 10% of (direct and overhead)
- $2.25
- Loaded rate
- $24.77 / CF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
