Octagon column form
$22.13 / LF
CN-203 · MasterFormat 03 11 00 · LF
What’s in this rate
This unit is setting one linear foot of reusable octagon concrete column form at a prepared column line. The cement mason assembles, plumbs, braces, and strips the octagon form. Concrete placement, reinforcement, liners, and engineered shoring are separate units.
Includes
- reusable octagon column-form allowance
- ties, clamps, and release agent
- set, plumb, brace, and strip octagon form
- small tools
Excludes
- concrete placement
- reinforcing steel
- architectural form liner
- engineered shoring
- embeds
- testing
Build-up
- Labor 0.245 hr × $48.00 wage and burden
- $11.76
- Material and small tools
- $6.53
- Direct rate (labor, material, and tools)
- $18.29 / LF
- Overhead 10% of direct
- $1.83
- Fee 10% of (direct and overhead)
- $2.01
- Loaded rate
- $22.13 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
