Dock approach slab
$9.49 / SF
CN-084 · MasterFormat 03 30 00 · SF
What’s in this rate
This unit is placing and finishing one square foot of commercial dock approach slab-on-grade. The cement mason places, screeds, floats, and finishes the approach face ready for cure. The rate is per square foot of slab surface. Base, reinforcement, edge forms, and dock equipment are separate units.
Includes
- ready-mix for dock approach slab with 5% waste
- place, screed, float, and finish
- small tools
Excludes
- subgrade; base; dock equipment; bumpers; reinforcement; edge forms; sawcuts; after-hours
Build-up
- Labor 0.085 hr × $48.00 wage and burden
- $4.08
- Material and small tools
- $3.77
- Direct rate (labor, material, and tools)
- $7.85 / SF
- Overhead 10% of direct
- $0.78
- Fee 10% of (direct and overhead)
- $0.86
- Loaded rate
- $9.49 / SF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
