Drive apron place
$8.92 / SF
CN-072 · MasterFormat 03 30 00 · SF
What’s in this rate
This unit is placing and finishing one square foot of commercial drive apron slab-on-grade. The cement mason places, screeds, and finishes the apron face ready for cure. The rate is per square foot of apron surface. Sidewalk, curb and gutter, and apron broom finish are separate units.
Includes
- ready-mix concrete for typical drive apron thickness with 5% waste
- place, screed, float, and finish
- small tools
Excludes
- sidewalk (buy concrete-sidewalk)
- curb and gutter (buy concrete-curb-and-gutter)
- apron broom finish-only (buy concrete-broom-finish-apron)
- edge forms / sawcut
Build-up
- Labor 0.08 hr × $48.00 wage and burden
- $3.84
- Material and small tools
- $3.53
- Direct rate (labor, material, and tools)
- $7.37 / SF
- Overhead 10% of direct
- $0.74
- Fee 10% of (direct and overhead)
- $0.81
- Loaded rate
- $8.92 / SF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
