Concrete Driveway 4", Broom Finish
$4.94 / SF
RP1-007 · MasterFormat 03 30 00 · SF
What’s in this rate
A 4-inch concrete driveway slab with a broom finish. A concrete finisher and laborer place and screed the concrete, float it, cut control joints and drag a broom for a non-slip surface. It is priced per square foot. The rate covers labor and material, plus 10% overhead and a 10% fee. Base, rebar/mesh and excavation are priced as separate units.
Includes
- A 4-inch concrete driveway slab with a broom finish
- A concrete finisher and laborer place and screed the concrete, float it, cut control joints and drag a broom for a non-slip surface
Excludes
- Base, rebar/mesh and excavation
Build-up
- Concrete Finisher, 0.022 hr × $46.00
- $1.01
- Laborer, 0.018 hr × $41.00
- $0.74
- Material and small tools
- $2.33
- Direct rate (labor, material, and tools)
- $4.08 / SF
- Overhead 10% of direct
- $0.41
- Fee 10% of (direct and overhead)
- $0.45
- Loaded rate
- $4.94 / SF
Questions
What does the Concrete Driveway 4", Broom Finish unit include?
A 4-inch concrete driveway slab with a broom finish. A concrete finisher and laborer place and screed the concrete, float it, cut control joints and drag a broom for a non-slip surface.
Which items are separate from Concrete Driveway 4", Broom Finish?
Base, rebar/mesh and excavation are priced on their own units.
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
