Ductbank encasement
$18.49 / CF
CN-100 · MasterFormat 03 30 00 · CF
What’s in this rate
This unit is placing one cubic foot of concrete encasement around prepared utility ductbank. The cement mason places and consolidates the encasement to provide a continuous protective mass. Ducts, trenching, bedding, testing, and backfill are separate units.
Includes
- ready-mix encasement concrete with 5% waste
- place and consolidate around installed ductbank
- small tools
Excludes
- ducts
- conduit
- trenching
- bedding
- testing
- backfill
- rebar
- excavation
Build-up
- Labor 0.18 hr × $48.00 wage and burden
- $8.64
- Material and small tools
- $6.64
- Direct rate (labor, material, and tools)
- $15.28 / CF
- Overhead 10% of direct
- $1.53
- Fee 10% of (direct and overhead)
- $1.68
- Loaded rate
- $18.49 / CF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
