Grade beam place

$34.37 / CF

CN-039 · MasterFormat 03 31 00 · CF

What’s in this rate

This unit is placing one cubic foot of concrete in a grade beam between footings. The cement mason places and consolidates the beam concrete ready for cure. The rate is per cubic foot of beam volume. Excavation, forms, rebar, and adjacent footings are separate units.

Includes

  • ready-mix concrete with 5% waste
  • place and consolidate
  • form lumber share amortized
  • small tools

Excludes

  • excavation / shoring
  • full form set beyond amortized share
  • rebar / stirrups
  • adjacent column footings

Build-up

Labor 0.36 hr × $48.00 wage and burden
$17.28
Material and small tools
$11.13
Direct rate (labor, material, and tools)
$28.41 / CF
Overhead 10% of direct
$2.84
Fee 10% of (direct and overhead)
$3.12
Loaded rate
$34.37 / CF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.