Grade beam pour
$25.19 / CF
CN-124 · MasterFormat 03 30 00 · CF
What’s in this rate
This unit is placing one cubic foot of cast-in-place concrete grade beam at a prepared foundation. The cement mason places, consolidates, and finishes the beam mass ready for cure.
Includes
- ready-mix concrete with 5% waste
- place, consolidate, and finish grade beam
- small tools
Excludes
- excavation
- rebar
- full formwork
- anchors and embeds
- backfill
- testing
Build-up
- Labor 0.24 hr × $48.00 wage and burden
- $11.52
- Material and small tools
- $9.30
- Direct rate (labor, material, and tools)
- $20.82 / CF
- Overhead 10% of direct
- $2.08
- Fee 10% of (direct and overhead)
- $2.29
- Loaded rate
- $25.19 / CF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
