Grout under baseplate

$9.73 / CF

CN-089 · MasterFormat 03 60 00 · CF

What’s in this rate

This unit is placing one cubic foot of nonshrink grout beneath a prepared equipment baseplate. The cement mason mixes, places, and finishes the grout to the baseplate edge. Baseplate, anchors, equipment, and concrete base are separate units.

Includes

  • nonshrink grout with 5% waste
  • place and finish grout beneath prepared baseplate
  • small tools

Excludes

  • baseplate; equipment; anchor bolts; leveling; machine-base concrete; after-hours

Build-up

Labor 0.1 hr × $48.00 wage and burden
$4.80
Material and small tools
$3.25
Direct rate (labor, material, and tools)
$8.05 / CF
Overhead 10% of direct
$0.80
Fee 10% of (direct and overhead)
$0.88
Loaded rate
$9.73 / CF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.