Loading dock apron
$12.13 / SF
CN-137 · MasterFormat 03 30 00 · SF
What’s in this rate
This unit is placing and finishing one square foot of concrete loading-dock apron at prepared base. The cement mason places, screeds, floats, and finishes the apron transition.
Includes
- apron concrete with 5% waste
- place, screed, float, and finish
- small tools
Excludes
- subgrade
- base preparation
- reinforcement
- dock equipment
- sawcuts
- curing
- testing
Build-up
- Labor 0.12 hr × $48.00 wage and burden
- $5.76
- Material and small tools
- $4.27
- Direct rate (labor, material, and tools)
- $10.03 / SF
- Overhead 10% of direct
- $1.00
- Fee 10% of (direct and overhead)
- $1.10
- Loaded rate
- $12.13 / SF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
