Pile cap place
$29.07 / CF
CN-066 · MasterFormat 03 31 00 · CF
What’s in this rate
This unit is forming and placing one cubic foot of pile-cap concrete. The cement mason forms the pile-cap share, places, consolidates, and finishes the cap ready for cure. The rate is per cubic foot of placed concrete. Pier place, spread footing, and helical pier caps are separate units.
Includes
- ready-mix concrete with 5% waste
- form lumber share amortized
- place, consolidate, and finish
- small tools
Excludes
- driven / drilled pier (buy concrete-pier)
- spread footing (buy concrete-spread-footing)
- helical pier cap (buy concrete-helical-pier-cap)
- rebar / embeds
- excavation / after-hours
Build-up
- Labor 0.3 hr × $48.00 wage and burden
- $14.40
- Material and small tools
- $9.63
- Direct rate (labor, material, and tools)
- $24.03 / CF
- Overhead 10% of direct
- $2.40
- Fee 10% of (direct and overhead)
- $2.64
- Loaded rate
- $29.07 / CF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
