Pile cap form set

$13.29 / LF

CN-109 · MasterFormat 03 11 00 · LF

What’s in this rate

This unit is setting one linear foot of pile-cap formwork at a prepared commercial foundation. The cement mason cuts, aligns, braces, and secures the form share ready for concrete placement. Concrete, rebar, excavation, and stripping are separate units.

Includes

  • pile-cap form lumber/share with 5% waste
  • braces and fasteners
  • cut, align, brace, and secure forms
  • small tools

Excludes

  • pile-cap concrete
  • rebar
  • excavation
  • shoring
  • stripping
  • testing

Build-up

Labor 0.14 hr × $48.00 wage and burden
$6.72
Material and small tools
$4.26
Direct rate (labor, material, and tools)
$10.98 / LF
Overhead 10% of direct
$1.10
Fee 10% of (direct and overhead)
$1.21
Loaded rate
$13.29 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.