Pile cap form set
$13.29 / LF
CN-109 · MasterFormat 03 11 00 · LF
What’s in this rate
This unit is setting one linear foot of pile-cap formwork at a prepared commercial foundation. The cement mason cuts, aligns, braces, and secures the form share ready for concrete placement. Concrete, rebar, excavation, and stripping are separate units.
Includes
- pile-cap form lumber/share with 5% waste
- braces and fasteners
- cut, align, brace, and secure forms
- small tools
Excludes
- pile-cap concrete
- rebar
- excavation
- shoring
- stripping
- testing
Build-up
- Labor 0.14 hr × $48.00 wage and burden
- $6.72
- Material and small tools
- $4.26
- Direct rate (labor, material, and tools)
- $10.98 / LF
- Overhead 10% of direct
- $1.10
- Fee 10% of (direct and overhead)
- $1.21
- Loaded rate
- $13.29 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
