Raft foundation pour
$25.98 / CF
CN-185 · MasterFormat 03 30 00 · CF
What’s in this rate
This unit is placing one cubic foot of concrete into a prepared raft-foundation pour. The cement mason places, consolidates, and finishes the raft mass. Excavation, formwork, reinforcing steel, waterproofing, and testing are separate units.
Includes
- ready-mix concrete
- curing-material allowance
- place, consolidate, and finish raft foundation
- small tools
Excludes
- excavation
- formwork
- reinforcing steel
- waterproofing
- pump mobilization
- testing
Build-up
- Labor 0.27 hr × $48.00 wage and burden
- $12.96
- Material and small tools
- $8.51
- Direct rate (labor, material, and tools)
- $21.47 / CF
- Overhead 10% of direct
- $2.15
- Fee 10% of (direct and overhead)
- $2.36
- Loaded rate
- $25.98 / CF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
