Void form place
$5.20 / SF
CN-092 · MasterFormat 03 11 00 · SF
What’s in this rate
This unit is placing one square foot of void form below a commercial grade beam or structural pour. The cement mason cuts, sets, and secures the void form ready for reinforcement and concrete. Excavation, reinforcement, concrete, and backfill are separate units.
Includes
- void-form material with 5% waste
- cut, set, and secure void form below grade beam
- small tools
Excludes
- excavation; subgrade; grade beam concrete; reinforcing steel; backfill; after-hours
Build-up
- Labor 0.06 hr × $48.00 wage and burden
- $2.88
- Material and small tools
- $1.42
- Direct rate (labor, material, and tools)
- $4.30 / SF
- Overhead 10% of direct
- $0.43
- Fee 10% of (direct and overhead)
- $0.47
- Loaded rate
- $5.20 / SF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
