Centerbulb PVC waterstop
$9.04 / LF
CN-190 · MasterFormat 03 15 00 · LF
What’s in this rate
This unit is installing one linear foot of centerbulb PVC waterstop at a prepared concrete joint. The cement mason positions, splices, and secures the waterstop. Injectable hose, hydrophilic strip, bentonite, and joint sealant are separate units.
Includes
- centerbulb PVC waterstop
- splice and clip allowance
- position, splice, and secure waterstop
- small tools
Excludes
- injectable hose waterstop
- hydrophilic strip
- bentonite waterstop
- joint sealant
- formwork
- concrete placement
Build-up
- Labor 0.075 hr × $48.00 wage and burden
- $3.60
- Material and small tools
- $3.87
- Direct rate (labor, material, and tools)
- $7.47 / LF
- Overhead 10% of direct
- $0.75
- Fee 10% of (direct and overhead)
- $0.82
- Loaded rate
- $9.04 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
