Centerbulb PVC waterstop

$9.04 / LF

CN-190 · MasterFormat 03 15 00 · LF

What’s in this rate

This unit is installing one linear foot of centerbulb PVC waterstop at a prepared concrete joint. The cement mason positions, splices, and secures the waterstop. Injectable hose, hydrophilic strip, bentonite, and joint sealant are separate units.

Includes

  • centerbulb PVC waterstop
  • splice and clip allowance
  • position, splice, and secure waterstop
  • small tools

Excludes

  • injectable hose waterstop
  • hydrophilic strip
  • bentonite waterstop
  • joint sealant
  • formwork
  • concrete placement

Build-up

Labor 0.075 hr × $48.00 wage and burden
$3.60
Material and small tools
$3.87
Direct rate (labor, material, and tools)
$7.47 / LF
Overhead 10% of direct
$0.75
Fee 10% of (direct and overhead)
$0.82
Loaded rate
$9.04 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.