Archway bead trim
$8.33 / LF
DW-058 · MasterFormat 09 22 00 · LF
What’s in this rate
This unit is installing one linear foot of bead trim at a prepared commercial archway. The carpenter cuts, bends, sets, and secures the bead ready for finish coats. Corner bead, J/L bead, shadow bead, framing, and tape-and-finish are separate units.
Includes
- archway bead with 5% waste
- cut, bend, set, and secure trim
- small tools
Excludes
- arch framing
- corner bead
- J/L bead
- shadow bead
- tape and finish
Build-up
- Labor 0.1 hr × $55.00 wage and burden
- $5.50
- Material and small tools
- $1.38
- Direct rate (labor, material, and tools)
- $6.88 / LF
- Overhead 10% of direct
- $0.69
- Fee 10% of (direct and overhead)
- $0.76
- Loaded rate
- $8.33 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
