Metal stud partition 16ga
$15.15 / LF
DW-057 · MasterFormat 09 22 00 · LF
What’s in this rate
This unit is framing one linear foot of 16-gauge metal stud partition, with track and studs amortized along the wall run. The carpenter cuts and fastens the framing ready for hang. Deflection track, kickers, backing, door frames, and drywall hang are separate units.
Includes
- 16-gauge studs and track with 5% waste plus fasteners
- cut, set track, and install studs
- small tools
Excludes
- drywall hang
- deflection track
- kickers
- backing
- door frames
- engineering
Build-up
- Labor 0.14 hr × $55.00 wage and burden
- $7.70
- Material and small tools
- $4.82
- Direct rate (labor, material, and tools)
- $12.52 / LF
- Overhead 10% of direct
- $1.25
- Fee 10% of (direct and overhead)
- $1.38
- Loaded rate
- $15.15 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
