5/8" abuse glass-mat hang
$6.53 / SF
DW-064 · MasterFormat 09 29 00 · SF
What’s in this rate
This unit is hanging one square foot of 5/8-inch abuse glass-mat gypsum board on prepared framing. The carpenter cuts, lifts, and screw-attaches the board. Framing, backing, sealant, and tape-and-finish are separate units.
Includes
- 5/8-inch abuse glass-mat board with 10% waste
- drywall screws
- cut, hang, and screw to prepared framing
- small tools
Excludes
- framing
- backing
- acoustic sealant
- tape and finish
- insulation
- firestopping
Build-up
- Labor 0.075 hr × $55.00 wage and burden
- $4.13
- Material and small tools
- $1.27
- Direct rate (labor, material, and tools)
- $5.40 / SF
- Overhead 10% of direct
- $0.54
- Fee 10% of (direct and overhead)
- $0.59
- Loaded rate
- $6.53 / SF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
