5/8" abuse glass-mat hang

$6.53 / SF

DW-064 · MasterFormat 09 29 00 · SF

What’s in this rate

This unit is hanging one square foot of 5/8-inch abuse glass-mat gypsum board on prepared framing. The carpenter cuts, lifts, and screw-attaches the board. Framing, backing, sealant, and tape-and-finish are separate units.

Includes

  • 5/8-inch abuse glass-mat board with 10% waste
  • drywall screws
  • cut, hang, and screw to prepared framing
  • small tools

Excludes

  • framing
  • backing
  • acoustic sealant
  • tape and finish
  • insulation
  • firestopping

Build-up

Labor 0.075 hr × $55.00 wage and burden
$4.13
Material and small tools
$1.27
Direct rate (labor, material, and tools)
$5.40 / SF
Overhead 10% of direct
$0.54
Fee 10% of (direct and overhead)
$0.59
Loaded rate
$6.53 / SF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.