J-bead / L-bead
$5.14 / LF
DW-019 · MasterFormat 09 29 00 · LF
What’s in this rate
This unit is installing one linear foot of J-bead or L-bead at a drywall termination. The carpenter cuts, aligns, and fastens the bead. The rate is per linear foot. Corner bead, control joint, and tape and finish are separate units.
Includes
- Vinyl or metal J-bead or L-bead
- Cut, align, and fasten
- Small tools
Excludes
- Metal corner bead
- Tape and finish coats over the bead
- Control joint
- Reveal trim
Build-up
- Labor 0.06 hr × $55.00 wage and burden
- $3.30
- Material and small tools
- $0.95
- Direct rate (labor, material, and tools)
- $4.25 / LF
- Overhead 10% of direct
- $0.42
- Fee 10% of (direct and overhead)
- $0.47
- Loaded rate
- $5.14 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
