J-bead / L-bead

$5.14 / LF

DW-019 · MasterFormat 09 29 00 · LF

What’s in this rate

This unit is installing one linear foot of J-bead or L-bead at a drywall termination. The carpenter cuts, aligns, and fastens the bead. The rate is per linear foot. Corner bead, control joint, and tape and finish are separate units.

Includes

  • Vinyl or metal J-bead or L-bead
  • Cut, align, and fasten
  • Small tools

Excludes

  • Metal corner bead
  • Tape and finish coats over the bead
  • Control joint
  • Reveal trim

Build-up

Labor 0.06 hr × $55.00 wage and burden
$3.30
Material and small tools
$0.95
Direct rate (labor, material, and tools)
$4.25 / LF
Overhead 10% of direct
$0.42
Fee 10% of (direct and overhead)
$0.47
Loaded rate
$5.14 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.