Smoke-seal penetration

$8.24 / EA

DW-077 · MasterFormat 09 29 00 · EA

What’s in this rate

This unit is sealing one prepared gypsum-wall penetration with listed smoke-seal material. The drywall finisher applies and tools the seal to a continuous finish.

Includes

  • smoke-seal material with 5% waste
  • apply and tool penetration seal
  • small tools

Excludes

  • tested firestop system
  • sleeve
  • backing
  • framing
  • inspection
  • penetration preparation

Build-up

Labor 0.115 hr × $44.00 wage and burden
$5.06
Material and small tools
$1.75
Direct rate (labor, material, and tools)
$6.81 / EA
Overhead 10% of direct
$0.68
Fee 10% of (direct and overhead)
$0.75
Loaded rate
$8.24 / EA

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.