L-bead corner trim

$6.39 / LF

DW-076 · MasterFormat 09 22 00 · LF

What’s in this rate

This unit is installing one linear foot of L-bead corner trim on prepared gypsum. The carpenter cuts, sets, and secures the bead ready for finish coats.

Includes

  • L-bead with 5% waste
  • cut, set, and secure trim
  • small tools

Excludes

  • gypsum hang
  • tape and finish
  • metal bead
  • vinyl bead
  • paper-faced bead
  • bullnose bead

Build-up

Labor 0.075 hr × $55.00 wage and burden
$4.12
Material and small tools
$1.16
Direct rate (labor, material, and tools)
$5.28 / LF
Overhead 10% of direct
$0.53
Fee 10% of (direct and overhead)
$0.58
Loaded rate
$6.39 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.