L-bead corner trim
$6.39 / LF
DW-076 · MasterFormat 09 22 00 · LF
What’s in this rate
This unit is installing one linear foot of L-bead corner trim on prepared gypsum. The carpenter cuts, sets, and secures the bead ready for finish coats.
Includes
- L-bead with 5% waste
- cut, set, and secure trim
- small tools
Excludes
- gypsum hang
- tape and finish
- metal bead
- vinyl bead
- paper-faced bead
- bullnose bead
Build-up
- Labor 0.075 hr × $55.00 wage and burden
- $4.12
- Material and small tools
- $1.16
- Direct rate (labor, material, and tools)
- $5.28 / LF
- Overhead 10% of direct
- $0.53
- Fee 10% of (direct and overhead)
- $0.58
- Loaded rate
- $6.39 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
