Footing excavation, spread footing
$153.54 / EA
EW-021 · MasterFormat 31 23 16 · EA
What’s in this rate
This unit covers Footing excavation, spread footing, measured per each. The operator excavates a spread-footing pit with working room and the laborer hand-trims the bottom. The rate covers the listed material, labor, and small tools. Continuous footings, forms, rebar, concrete, and haul-off stay on their own units.
Includes
- excavate ~6x6 ft x 3.5 ft pad and working room
- hand trim / clean bottom
- spoil alongside
- operator and laborer time and equipment listed in the build-up
- stated material waste and small tools
Excludes
- concrete-spread-footing-* / concrete-column-footing (concrete scope)
- forms, rebar, concrete
- over-excavation
- haul-off
- tax / freight beyond the stated delivered material prices
- after-hours, premium access, and contaminated / hazardous soil handling
- geotechnical testing, surveying / staking, and permits
Build-up
- Operator, 0.6 hr × $52.00
- $31.20
- Laborer, 1 hr × $38.00
- $38.00
- Material and small tools
- $0.69
- Equipment, hydraulic excavator ~20 t / ~1 CY bucket class, 0.6 hr per unit
- $57.00
- Direct rate (labor, material, equipment, and tools)
- $126.89 / EA
- Overhead 10% of direct
- $12.69
- Fee 10% of (direct and overhead)
- $13.96
- Loaded rate
- $153.54 / EA
Worked extension: 1 EA of commercial footing excavation, spread footing × $153.54 = $153.54 loaded for 1 EA. Quantity is a worked extension.