Also see electrical unit rates, low-voltage unit rates, roofing unit rates, drywall unit rates, painting unit rates, concrete unit rates, flooring unit rates, plumbing unit rates, HVAC unit rates, fire protection unit rates, masonry unit rates, structural steel unit rates, siding unit rates, tile unit rates, windows and doors unit rates, and cabinets and countertops unit rates.
- Aggregate base course, 10 in compacted$1.82 / SFIncludes 10% overhead and 10% fee
- Aggregate base course, 12 in compacted$2.17 / SFIncludes 10% overhead and 10% fee
- Aggregate base, 4 in$0.74 / SFIncludes 10% overhead and 10% fee
- Aggregate base, 6 in$1.11 / SFIncludes 10% overhead and 10% fee
- Aggregate base, 8 in$1.45 / SFIncludes 10% overhead and 10% fee
- Basement ExcavationNew Construction$4.97 / CYIncludes 10% overhead and 10% fee
- Biaxial geogrid, Type 1 (BX1100 class)$0.44 / SFIncludes 10% overhead and 10% fee
- Biaxial geogrid, Type 2 (BX1200 class)New Construction$0.63 / SFIncludes 10% overhead and 10% fee
- Building pad cut, 2 ft average — $0.23/SFNew Construction$0.23 / SFIncludes 10% overhead and 10% fee
- Building pad excavation, common earth — $3.04/CYNew Construction$3.04 / CYIncludes 10% overhead and 10% fee
- Bulk excavation, common earth$2.54 / CYIncludes 10% overhead and 10% fee
- Bulk excavation, sand and loose granular soil$2.11 / CYIncludes 10% overhead and 10% fee
- Bulk excavation, stiff clay$3.38 / CYIncludes 10% overhead and 10% fee
- Chain-link fence 4 ftNew Construction$26.06 / LFIncludes 10% overhead and 10% fee
- Clearing and grubbing, light brush$0.10 / SFIncludes 10% overhead and 10% fee
- Clearing and grubbing, medium brush and trees$0.17 / SFIncludes 10% overhead and 10% fee
- Clearing and grubbing, wooded$0.24 / SFIncludes 10% overhead and 10% fee
- Common fill, place and compact, 12 in lifts$2.08 / CYIncludes 10% overhead and 10% fee
- Common fill, place and compact, 18 in lifts$1.73 / CYIncludes 10% overhead and 10% fee
- Composite deck installedNew Construction$25.85 / SFIncludes 10% overhead and 10% fee
- Concrete washout container, prefabricated 4 ft x 4 ft$164.71 / EAIncludes 10% overhead and 10% fee
- Concrete washout container, prefabricated 6 ft x 6 ftNew Construction$260.51 / EAIncludes 10% overhead and 10% fee
- Deck demolitionRemoval$5.01 / SFIncludes 10% overhead and 10% fee
- Dewatering sump pit$673.87 / EAIncludes 10% overhead and 10% fee
- Dozer cut to fill, 100 ft push$1.56 / CYIncludes 10% overhead and 10% fee
- Dozer cut to fill, 200 ft push$2.13 / CYIncludes 10% overhead and 10% fee
- Dozer cut to fill, 300 ft push$2.93 / CYIncludes 10% overhead and 10% fee
- Driveway Subgrade PrepNew Construction$0.19 / SFIncludes 10% overhead and 10% fee
- Erosion control blanketNew Construction$0.29 / SFIncludes 10% overhead and 10% fee
- Excavation Dewatering - 4 in Diesel Trash Pump incl. Fuel (per Day, 8 hr Run)$508.55 / DAYIncludes 10% overhead and 10% fee
- Minor Dewatering - Submersible Utility Pump, Small Excavation or Sump (per Day)New Construction$213.17 / DAYIncludes 10% overhead and 10% fee
- Export clean soil off-site, 10 miles$16.77 / CYIncludes 10% overhead and 10% fee
- Fiber roll (wattle), 9 in$3.67 / LFIncludes 10% overhead and 10% fee
- Fine grading, motor grader (large area)$0.12 / SFIncludes 10% overhead and 10% fee
- Footing Excavation 24" x 12"New Construction$3.06 / LFIncludes 10% overhead and 10% fee
- Footing excavation, continuous 24 x 30 in$6.51 / LFIncludes 10% overhead and 10% fee
- Footing excavation, spread footing$157.89 / EAIncludes 10% overhead and 10% fee
- Foundation wall backfill, free-draining$52.11 / CYIncludes 10% overhead and 10% fee
- Foundation wall backfill, native$11.95 / CYIncludes 10% overhead and 10% fee
- Geotextile, nonwoven separation$0.23 / SFIncludes 10% overhead and 10% fee
- Geotextile, woven stabilization$0.19 / SFIncludes 10% overhead and 10% fee
- Hand excavation, spot$80.11 / CYIncludes 10% overhead and 10% fee
- Haul excavated material off site, 15 mi$13.21 / CYIncludes 10% overhead and 10% fee
- Haul excavated material off site, 25 mi$18.17 / CYIncludes 10% overhead and 10% fee
- Haul excavated material off site, 30 mi$19.95 / CYIncludes 10% overhead and 10% fee
- Import common fill$20.91 / CYIncludes 10% overhead and 10% fee
- Import structural fill$54.30 / CYIncludes 10% overhead and 10% fee
- Inlet protection, curb inletNew Construction$70.85 / EAIncludes 10% overhead and 10% fee
- Inlet protection, grate inletNew Construction$85.20 / EAIncludes 10% overhead and 10% fee
- Lot Clearing, Light BrushRemoval$0.07 / SFIncludes 10% overhead and 10% fee
Site prep and erosion
Use these rates in your own workflow. Manage your own rates and proposals.
Keep earthwork rates in a private library
Create a free account to store your own hours, burden, and supplier quotes.