Topsoil respread from stockpile, 6 in

$0.05 / SF

EW-069 · MasterFormat 31 14 13 · SF

What’s in this rate

This unit covers topsoil respread from stockpile, 6 in, measured per square foot. The operator pushes stockpiled site topsoil out with a dozer and finishes it to 6 inches with a skid steer, with a laborer raking edges. The rate covers the listed material, labor, and small tools. Imported topsoil, screening, amendments, and seeding stay on their own units.

Includes

  • dozer spread from on-site stockpile ≤200 ft
  • skid-steer finish to 6 in
  • hand rake at edges
  • operator and laborer time and equipment listed in the build-up
  • stated material waste and small tools

Excludes

  • imported / screened topsoil
  • soil amendments and fertilizer
  • seeding / sod / hydroseed
  • fine landscape grading
  • sales tax; freight beyond what the build-up states
  • after-hours, premium access, and contaminated / hazardous soil handling
  • geotechnical testing, surveying / staking, and permits

Build-up

Operator, 0.0002452 hr × $52.00
$0.02
Material and small tools
$0.00
Equipment, crawler dozer ~D6 class, 0.0001852 hr per unit
$0.02
Equipment, skid steer / compact track loader, 0.00006 hr per unit
$0.01
Direct rate (labor, material, equipment, and tools)
$0.05 / SF
Overhead 10% of direct
$0.00
Fee 10% of (direct and overhead)
$0.00
Loaded rate
$0.05 / SF

Worked extension: 1,000 SF of commercial topsoil respread from stockpile, 6 in × $0.05 = $50.00 loaded for 1,000 SF. Quantity is a worked extension.

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.