Cement-board underlayment

$8.48 / SF

FL-145 · MasterFormat 09 05 00 · SF

What’s in this rate

This SF unit installs rigid 1/4-inch cementitious backer-board panels over a sound structural substrate as tile backing; the crew beds, fastens, staggers, and tapes panel joints. It is a panel underlayment. Moisture, crack-isolation, acoustic, cork, plywood, and self-leveling membrane systems stay on their own units.

Includes

  • 1/4-inch cementitious backer-board panel
  • thinset bedding, alkali-resistant tape, and backer-board screws
  • bed, fasten, stagger, and tape rigid panel joints

Excludes

  • fluid or sheet moisture membrane
  • crack-isolation membrane
  • acoustic or sound-control membrane
  • cork or plywood underlayment
  • self-leveling underlayment
  • structural subfloor repair
  • after-hours work

Build-up

Labor 0.09 hr × $55.00 wage and burden
$4.95
Material and small tools
$2.06
Direct rate (labor, material, and tools)
$7.01 / SF
Overhead 10% of direct
$0.70
Fee 10% of (direct and overhead)
$0.77
Loaded rate
$8.48 / SF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.