Metal end-cap transition

$13.07 / LF

FL-146 · MasterFormat 09 65 00 · LF

What’s in this rate

This LF unit installs an aluminum end-cap transition at an exposed flooring edge; the crew measures, cuts, anchors, bonds, and aligns the profile. Reducers, T-bars, Z-bars, thresholds, specialty tile trims, and substrate repair are separate units.

Includes

  • commercial aluminum end-cap profile
  • anchors and manufacturer adhesive
  • measure, cut, anchor, bond, and align

Excludes

  • metal reducer
  • T-bar or Z-bar
  • threshold
  • specialty tile-edge profile
  • substrate repair
  • after-hours work

Build-up

Labor 0.1 hr × $55.00 wage and burden
$5.50
Material and small tools
$5.30
Direct rate (labor, material, and tools)
$10.80 / LF
Overhead 10% of direct
$1.08
Fee 10% of (direct and overhead)
$1.19
Loaded rate
$13.07 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.