Metal end-cap transition
$13.07 / LF
FL-146 · MasterFormat 09 65 00 · LF
What’s in this rate
This LF unit installs an aluminum end-cap transition at an exposed flooring edge; the crew measures, cuts, anchors, bonds, and aligns the profile. Reducers, T-bars, Z-bars, thresholds, specialty tile trims, and substrate repair are separate units.
Includes
- commercial aluminum end-cap profile
- anchors and manufacturer adhesive
- measure, cut, anchor, bond, and align
Excludes
- metal reducer
- T-bar or Z-bar
- threshold
- specialty tile-edge profile
- substrate repair
- after-hours work
Build-up
- Labor 0.1 hr × $55.00 wage and burden
- $5.50
- Material and small tools
- $5.30
- Direct rate (labor, material, and tools)
- $10.80 / LF
- Overhead 10% of direct
- $1.08
- Fee 10% of (direct and overhead)
- $1.19
- Loaded rate
- $13.07 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
