Floor prep shotblast

$2.96 / SF

FL-037 · MasterFormat 03 01 00 · SF

What’s in this rate

This unit is shotblasting one square foot of concrete floor for coatings or resilient finishes. The crew blasts, vacuums, and leaves a prepared surface. The rate is per square foot of blasted floor. Mechanical grind, adhesive removal, moisture mitigation, and finish flooring are separate units.

Includes

  • shotblast concrete surface prep
  • media / filter consumable share
  • sweep / vac after blast
  • small tools

Excludes

  • floor grind prep (see floor-grind-prep)
  • adhesive remove
  • moisture mitigation
  • finish floor / coating
  • equipment rental beyond media share

Build-up

Labor 0.04 hr × $55.00 wage and burden
$2.20
Material and small tools
$0.25
Direct rate (labor, material, and tools)
$2.45 / SF
Overhead 10% of direct
$0.24
Fee 10% of (direct and overhead)
$0.27
Loaded rate
$2.96 / SF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.