HSS rectangular beam

$24.88 / LF

SS-015 · MasterFormat 05 12 00 · LF

What’s in this rate

This unit covers HSS rectangular beam, measured per linear foot. The ironworker shakes out, hoists, and installs the rectangular HSS beam or girt to line and elevation. The rate covers the listed material, 5.00% material waste, labor, and small tools. WF beams, HSS columns, HSS brace, and field connections are separate units.

Includes

  • fabricated rectangular HSS beam/girt delivery allocation
  • field bolts / consumables share
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • WF beams
  • HSS columns / round / square
  • HSS brace
  • field connections
  • paint-structural-steel-*
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.1 hr × $58.00 wage and burden
$5.80
Material and small tools
$14.76
Direct rate (labor, material, and tools)
$20.56 / LF
Overhead 10% of direct
$2.06
Fee 10% of (direct and overhead)
$2.26
Loaded rate
$24.88 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.