HSS brace
$24.39 / LF
SS-016 · MasterFormat 05 12 00 · LF
What’s in this rate
This unit covers HSS brace, measured per linear foot. The ironworker shakes out, hoists, and installs the HSS diagonal or chevron brace. The rate covers the listed material, 5.00% material waste, labor, and small tools. Brace-connection-gusset, HSS columns/beams, and WF framing are separate units.
Includes
- fabricated HSS brace delivery allocation
- field bolts / consumables share
- layout and installation described above
- stated material waste and small tools
Excludes
- brace-connection-gusset
- HSS columns / beams
- WF framing
- paint-structural-steel-*
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.12 hr × $58.00 wage and burden
- $6.96
- Material and small tools
- $13.19
- Direct rate (labor, material, and tools)
- $20.15 / LF
- Overhead 10% of direct
- $2.02
- Fee 10% of (direct and overhead)
- $2.22
- Loaded rate
- $24.39 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
