HSS square beam
$23.61 / LF
SS-D1-007 · MasterFormat 05 12 00 · LF
What’s in this rate
This unit covers HSS square beam, measured per linear foot. The ironworker shakes out, hoists, and installs the square HSS beam or girt to line and elevation. The rate covers the listed material, 5.00% material waste, labor, and small tools. Rectangular HSS beams, WF beams, HSS columns, HSS brace, and field connections are separate units.
Includes
- fabricated square HSS beam/girt delivery allocation
- field bolts / consumables share
- layout and installation described above
- stated material waste and small tools
Excludes
- hss-beam-rectangular (live)
- WF beams
- HSS columns / brace
- field connections
- paint-beam-*
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.1 hr × $58.00 wage and burden
- $5.80
- Material and small tools
- $13.71
- Direct rate (labor, material, and tools)
- $19.51 / LF
- Overhead 10% of direct
- $1.95
- Fee 10% of (direct and overhead)
- $2.15
- Loaded rate
- $23.61 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
