1" innerduct
$9.04 / LF
LV-066 · MasterFormat 27 05 28 · LF
What’s in this rate
This unit is placing 1-inch corrugated riser-rated innerduct with factory pull tape as a fiber or communications pathway. The technician pulls or lays the duct, ties supports, and leaves the pull tape ready for cable. The rate is per linear foot. Fiber cable, terminations, and enclosures are separate units.
Includes
- 1" corrugated Riser-Gard class innerduct with pull tape, orange
- place / support on accessible path
- leave pull tape ready
- stated material (and 8% waste on cable lines only, where a cable line exists)
- small tools shown as a separate line
Excludes
- fiber cable LF (buy fiber-om3-6strand / fiber-os2-6strand)
- fusion splice / connectors / enclosure
- outdoor UV duct and concrete-encased duct bank
- PVC Sch40 / Sch80 raceway
- tax / freight
- after-hours, premium access, hazardous-material handling
- permits, inspections, and testing beyond a functional check
Build-up
- Labor 0.05 hr × $60.00 wage and burden
- $3.00
- Material and small tools
- $4.47
- Direct rate (labor, material, and tools)
- $7.47 / LF
- Overhead 10% of direct
- $0.75
- Fee 10% of (direct and overhead)
- $0.82
- Loaded rate
- $9.04 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
