Mineral-wool partition board

$5.76 / SF

DW-085 · MasterFormat 07 21 00 · SF

What’s in this rate

This unit is installing one square foot of rigid mineral-wool partition board in a prepared wall cavity. The carpenter cuts, fits, and secures the board. Framing, gypsum board, batt insulation, perimeter fire safing, air sealing, and testing are separate units.

Includes

  • rigid mineral-wool partition board
  • retainers and fasteners
  • cut, fit, and secure board in prepared cavity
  • small tools

Excludes

  • framing
  • gypsum board
  • mineral-wool batt
  • perimeter fire safing
  • vapor retarder
  • air sealing
  • testing

Build-up

Labor 0.06 hr × $55.00 wage and burden
$3.30
Material and small tools
$1.46
Direct rate (labor, material, and tools)
$4.76 / SF
Overhead 10% of direct
$0.48
Fee 10% of (direct and overhead)
$0.52
Loaded rate
$5.76 / SF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.