Metal stud box header

$18.28 / LF

DW-086 · MasterFormat 09 22 00 · LF

What’s in this rate

This unit is fabricating and installing one linear foot of metal-stud box header at a prepared opening. The carpenter cuts, boxes, aligns, and fastens the header. Jamb studs, door frames, engineering, backing, drywall hang, and firestopping are separate units.

Includes

  • metal-stud and track header stock
  • screws and anchors
  • cut, box, align, and fasten header
  • small tools

Excludes

  • jamb and king studs
  • door frame
  • engineering
  • supplemental backing
  • drywall hang
  • firestopping

Build-up

Labor 0.19 hr × $55.00 wage and burden
$10.45
Material and small tools
$4.66
Direct rate (labor, material, and tools)
$15.11 / LF
Overhead 10% of direct
$1.51
Fee 10% of (direct and overhead)
$1.66
Loaded rate
$18.28 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.