Metal stud box header
$18.28 / LF
DW-086 · MasterFormat 09 22 00 · LF
What’s in this rate
This unit is fabricating and installing one linear foot of metal-stud box header at a prepared opening. The carpenter cuts, boxes, aligns, and fastens the header. Jamb studs, door frames, engineering, backing, drywall hang, and firestopping are separate units.
Includes
- metal-stud and track header stock
- screws and anchors
- cut, box, align, and fasten header
- small tools
Excludes
- jamb and king studs
- door frame
- engineering
- supplemental backing
- drywall hang
- firestopping
Build-up
- Labor 0.19 hr × $55.00 wage and burden
- $10.45
- Material and small tools
- $4.66
- Direct rate (labor, material, and tools)
- $15.11 / LF
- Overhead 10% of direct
- $1.51
- Fee 10% of (direct and overhead)
- $1.66
- Loaded rate
- $18.28 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
