Sound batt partition
$5.76 / SF
DW-113 · MasterFormat 07 21 00 · SF
What’s in this rate
This unit is installing one square foot of sound-attenuation batts in prepared partition framing. The carpenter cuts, fits, and secures the sound batts. Framing, gypsum board, fiberglass thermal batts, mineral-wool, and fire safing are separate units.
Includes
- sound-attenuation batt insulation
- friction-fit and staple allowance
- cut, fit, and secure sound batts
- small tools
Excludes
- framing
- gypsum board
- fiberglass thermal batts
- mineral-wool batts
- fire safing
- vapor barrier
Build-up
- Labor 0.06 hr × $55.00 wage and burden
- $3.30
- Material and small tools
- $1.46
- Direct rate (labor, material, and tools)
- $4.76 / SF
- Overhead 10% of direct
- $0.48
- Fee 10% of (direct and overhead)
- $0.52
- Loaded rate
- $5.76 / SF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
