Metal stud solid bridging

$11.13 / LF

DW-114 · MasterFormat 09 22 00 · LF

What’s in this rate

This unit is installing one linear foot of solid bridging on prepared metal-stud framing. The carpenter cuts, aligns, and fastens the solid bridging. Flat bridging, channel bridging, kicker braces, resilient channel, and drywall hang are separate units.

Includes

  • solid bridging channel and clip
  • screw and fastener allowance
  • cut, align, and fasten solid bridging
  • small tools

Excludes

  • metal studs
  • flat bridging
  • channel bridging
  • kicker brace
  • resilient channel
  • drywall hang

Build-up

Labor 0.115 hr × $55.00 wage and burden
$6.32
Material and small tools
$2.88
Direct rate (labor, material, and tools)
$9.20 / LF
Overhead 10% of direct
$0.92
Fee 10% of (direct and overhead)
$1.01
Loaded rate
$11.13 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.