Metal stud solid bridging
$11.13 / LF
DW-114 · MasterFormat 09 22 00 · LF
What’s in this rate
This unit is installing one linear foot of solid bridging on prepared metal-stud framing. The carpenter cuts, aligns, and fastens the solid bridging. Flat bridging, channel bridging, kicker braces, resilient channel, and drywall hang are separate units.
Includes
- solid bridging channel and clip
- screw and fastener allowance
- cut, align, and fasten solid bridging
- small tools
Excludes
- metal studs
- flat bridging
- channel bridging
- kicker brace
- resilient channel
- drywall hang
Build-up
- Labor 0.115 hr × $55.00 wage and burden
- $6.32
- Material and small tools
- $2.88
- Direct rate (labor, material, and tools)
- $9.20 / LF
- Overhead 10% of direct
- $0.92
- Fee 10% of (direct and overhead)
- $1.01
- Loaded rate
- $11.13 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
