Joist bridging diagonal
$10.00 / LF
SS-022 · MasterFormat 05 21 00 · LF
What’s in this rate
This unit covers Joist bridging diagonal, measured per linear foot. The ironworker installs diagonal or X bridging for open-web steel joists. The rate covers the listed material, 5.00% material waste, labor, and small tools. Horizontal bridging, joist install, and metal-stud bridging are separate units.
Includes
- diagonal/X joist bridging material
- fasteners
- layout and installation described above
- stated material waste and small tools
Excludes
- joist-bridging-horizontal
- open-web joist install
- metal-stud-bridging-* (drywall)
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.08 hr × $58.00 wage and burden
- $4.64
- Material and small tools
- $3.62
- Direct rate (labor, material, and tools)
- $8.26 / LF
- Overhead 10% of direct
- $0.83
- Fee 10% of (direct and overhead)
- $0.91
- Loaded rate
- $10.00 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
