Joist bridging horizontal

$7.83 / LF

SS-021 · MasterFormat 05 21 00 · LF

What’s in this rate

This unit covers Joist bridging horizontal, measured per linear foot. The ironworker installs horizontal bridging for open-web steel joists. The rate covers the listed material, 5.00% material waste, labor, and small tools. Diagonal bridging, joist install, and metal-stud bridging are separate units.

Includes

  • horizontal joist bridging material
  • fasteners
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • joist-bridging-diagonal
  • open-web joist install
  • metal-stud-bridging-* (drywall)
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.06 hr × $58.00 wage and burden
$3.48
Material and small tools
$2.99
Direct rate (labor, material, and tools)
$6.47 / LF
Overhead 10% of direct
$0.65
Fee 10% of (direct and overhead)
$0.71
Loaded rate
$7.83 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.