Joist bridging horizontal
$7.83 / LF
SS-021 · MasterFormat 05 21 00 · LF
What’s in this rate
This unit covers Joist bridging horizontal, measured per linear foot. The ironworker installs horizontal bridging for open-web steel joists. The rate covers the listed material, 5.00% material waste, labor, and small tools. Diagonal bridging, joist install, and metal-stud bridging are separate units.
Includes
- horizontal joist bridging material
- fasteners
- layout and installation described above
- stated material waste and small tools
Excludes
- joist-bridging-diagonal
- open-web joist install
- metal-stud-bridging-* (drywall)
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.06 hr × $58.00 wage and burden
- $3.48
- Material and small tools
- $2.99
- Direct rate (labor, material, and tools)
- $6.47 / LF
- Overhead 10% of direct
- $0.65
- Fee 10% of (direct and overhead)
- $0.71
- Loaded rate
- $7.83 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
