Ladder blocking in partition

$9.45 / LF

FR-004 · MasterFormat 06 10 00 · LF

What’s in this rate

This unit is installing one linear foot of horizontal ladder blocking in a framed partition so the bay can take shelving, grab bars, or other wall-hung work. The carpenter cuts the pieces, spaces them in the bay, and fastens them. The rate is per linear foot of blocking run. Millwork blocking and the wall framing unit are separate.

Includes

  • Horizontal ladder blocking in the stud bay
  • Fasteners
  • Cut, fit, and secure
  • Small tools

Excludes

  • Wood blocking for millwork
  • Metal stud framing billed by the square foot
  • In-wall backing plates by others

Build-up

Labor 0.1 hr × $55.00 wage and burden
$5.50
Material and small tools
$2.31
Direct rate (labor, material, and tools)
$7.81 / LF
Overhead 10% of direct
$0.78
Fee 10% of (direct and overhead)
$0.86
Loaded rate
$9.45 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.