Masonry dovetail anchor

$6.51 / EA

MS-D-024 · MasterFormat 04 05 19 · EA

What’s in this rate

This unit covers Masonry dovetail anchor, measured per each. The bricklayer installs a dovetail or slot anchor in the masonry backup as courses advance. The rate covers the listed material, 3.00% material waste, labor, and small tools. adjustable masonry wall tie, brick veneer, joint reinforcement are separate units.

Includes

  • dovetail / slot anchor
  • fastening to masonry backup as scoped
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • adjustable masonry-wall-tie
  • brick / CMU lay
  • joint reinforcement
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.06 hr × $52.00 wage and burden
$3.12
Material and small tools
$2.26
Direct rate (labor, material, and tools)
$5.38 / EA
Overhead 10% of direct
$0.54
Fee 10% of (direct and overhead)
$0.59
Loaded rate
$6.51 / EA