Masonry sealant joint

$9.44 / LF

MS-D-023 · MasterFormat 04 05 23 · LF

What’s in this rate

This unit covers Masonry sealant joint, measured per linear foot. The bricklayer installs sealant at the masonry control or expansion joint face with backer as scoped. The rate covers the listed material, 5.00% material waste, labor, and small tools. CMU control joint, masonry control joint gasket, brick expansion joint are separate units.

Includes

  • sealant at masonry control / expansion joint face
  • backer rod allocation as scoped
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • CMU control joint cut/slot
  • masonry control joint gasket
  • brick expansion joint densify
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.1 hr × $52.00 wage and burden
$5.20
Material and small tools
$2.60
Direct rate (labor, material, and tools)
$7.80 / LF
Overhead 10% of direct
$0.78
Fee 10% of (direct and overhead)
$0.86
Loaded rate
$9.44 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.