Masonry window buck

$117.25 / EA

MS-D-031 · MasterFormat 04 05 19 · EA

What’s in this rate

This unit covers Masonry window buck, measured per each. The bricklayer builds out a masonry window buck or frame in the CMU or brick opening, plumb and square. The rate covers the listed material, 5.00% material waste, labor, and small tools. masonry door buck, rough-opening-hm-door, hollow metal frame set in masonry, glass block panel are separate units.

Includes

  • buck / frame build-out materials in masonry window opening
  • mortar and fasteners allocation
  • layout plumb/square
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • masonry-door-buck
  • rough-opening-hm-door
  • hollow-metal-frame-masonry-set
  • door / window install
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 1.2 hr × $52.00 wage and burden
$62.40
Material and small tools
$34.50
Direct rate (labor, material, and tools)
$96.90 / EA
Overhead 10% of direct
$9.69
Fee 10% of (direct and overhead)
$10.66
Loaded rate
$117.25 / EA

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.