Masonry door buck
$143.87 / EA
MS-047 · MasterFormat 04 05 19 · EA
What’s in this rate
This unit covers Masonry door buck, measured per each. The bricklayer builds out a masonry door buck or frame in the CMU or brick opening, plumb and square. The rate covers the listed material, 5.00% material waste, labor, and small tools. rough-opening-hm-door, steel lintel set, CMU wall lay are separate units.
Includes
- buck / frame build-out materials in masonry
- mortar and fasteners allocation
- layout plumb/square
- layout and installation described above
- stated material waste and small tools
Excludes
- HM door rough opening densify (rough-opening-hm-door)
- door leaf / hardware install
- glass block panel
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 1.5 hr × $52.00 wage and burden
- $78.00
- Material and small tools
- $40.90
- Direct rate (labor, material, and tools)
- $118.90 / EA
- Overhead 10% of direct
- $11.89
- Fee 10% of (direct and overhead)
- $13.08
- Loaded rate
- $143.87 / EA
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.