Masonry door buck

$143.87 / EA

MS-047 · MasterFormat 04 05 19 · EA

What’s in this rate

This unit covers Masonry door buck, measured per each. The bricklayer builds out a masonry door buck or frame in the CMU or brick opening, plumb and square. The rate covers the listed material, 5.00% material waste, labor, and small tools. rough-opening-hm-door, steel lintel set, CMU wall lay are separate units.

Includes

  • buck / frame build-out materials in masonry
  • mortar and fasteners allocation
  • layout plumb/square
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • HM door rough opening densify (rough-opening-hm-door)
  • door leaf / hardware install
  • glass block panel
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 1.5 hr × $52.00 wage and burden
$78.00
Material and small tools
$40.90
Direct rate (labor, material, and tools)
$118.90 / EA
Overhead 10% of direct
$11.89
Fee 10% of (direct and overhead)
$13.08
Loaded rate
$143.87 / EA

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.